How to use the Concrete Calculator
- Choose what you're pouring and your measurement unit.
- Enter the dimensions (thickness for slabs, diameter and depth for posts).
- Set how many identical pours and a waste allowance (5–10% is common).
- Read the volume to order and the number of pre-mix bags.
How it works
Slab/footing volume = length × width × depth. Round column = π × (diameter ÷ 2)² × height. Steps are treated as solid: each step k is run × (k × rise) × width, summed over all steps. Volume × (1 + waste) gives the amount to order. Bags = order volume ÷ bag yield, rounded up (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³).
Worked examples
10×10 ft patio, 4 in thick
10 × 10 × 0.333 ft = 33.3 ft³ = 1.23 yd³. With 10% waste that's 1.36 yd³ — about 62 × 80 lb bags, so ready-mix delivery is likely cheaper.
Limitations and assumptions
- Bag yields vary by brand and mix; check the bag.
- Doesn't design reinforcement, base preparation or structural requirements — follow local codes for structural work.
Frequently asked questions
How thick should a patio slab be?
4 inches (10 cm) is common for patios and walkways; driveways are often 5–6 inches. Local codes and soil conditions decide.